Grout Volume & Cost Calculator
This calculator has been developed to allow you to quickly look at the volume and cost of the grout you would like to use on a given project or you can compare the costs of multiple grouts simultaneously.
Target Thermal Conductivities are automatically reset when Metric Units are toggled on or off. This is done because the mix ratios do not directly correlate.
Material Quantities
Fresh Water
() |
Yield
(/bag) |
% Sand
(by weight) |
% Solids
(by weight) |
|
|
% |
% |
| Grout Volume / Bore |
|
x |
Number of Bores |
|
= |
Total Grout Volume |
|
| |
Total Grout Volume |
|
÷ |
Yield |
/bag |
= |
Grout Bags Required |
|
|
| Grout Bags Required (rounded to whole pallet) |
|
|
Pallets of Grout Required |
|
|
Trucks of Grout |
|
| |
Sand Required |
|
÷ |
Sand Unit Weight |
|
= |
Sand Bags Required |
|
|
| Sand Bags Required (rounded to whole pallet) |
|
|
Pallets of Sand Required |
|
|
Trucks of Sand |
|
Fresh Water
() |
Yield
(/bag) |
% Sand
(by weight) |
% Solids
(by weight) |
|
|
% |
% |
| Grout Volume / Bore |
|
x |
Number of Bores |
|
= |
Total Grout Volume |
|
| |
Total Grout Volume |
|
÷ |
Yield |
/bag |
= |
Grout Bags Required |
|
|
| Grout Bags Required (rounded to whole pallet) |
|
|
Pallets of Grout Required |
|
|
Trucks of Grout |
|
| |
Sand Required |
|
÷ |
Sand Unit Weight |
|
= |
Sand Bags Required |
|
|
| Sand Bags Required (rounded to whole pallet) |
|
|
Pallets of Sand Required |
|
|
Trucks of Sand |
|
Fresh Water
() |
Yield
(/bag) |
% Sand
(by weight) |
% Solids
(by weight) |
|
|
% |
% |
| Grout Volume / Bore |
|
x |
Number of Bores |
|
= |
Total Grout Volume |
|
| |
Total Grout Volume |
|
÷ |
Yield |
/bag |
= |
Grout Bags Required |
|
|
| Grout Bags Required (rounded to whole pallet) |
|
|
Pallets of Grout Required |
|
|
Trucks of Grout |
|
| |
Sand Required |
|
÷ |
Sand Unit Weight |
|
= |
Sand Bags Required |
|
|
| Sand Bags Required (rounded to whole pallet) |
|
|
Pallets of Sand Required |
|
|
Trucks of Sand |
|
Project Cost
Full Truck Quantities
| |
|
|
|
| Material Cost |
|
|
|
| Freight Cost |
|
|
|
| Drilling Cost |
|
|
|
| U-Bend Cost |
|
|
|
| Mixing Cost |
|
|
|
| Pumping Cost |
|
|
|
| Total Project Cost |
|
|
|
| Total Project Cost / Bore |
|
|
|
Full Pallet Quantities
| |
|
|
|
| Material Cost |
|
|
|
| Freight Cost |
|
|
|
| Drilling Cost |
|
|
|
| U-Bend Cost |
|
|
|
| Mixing Cost |
|
|
|
| Pumping Cost |
|
|
|
| Total Project Cost |
|
|
|
| Total Project Cost / Bore |
|
|
|